Mizan
Docs

Domain adaptation — modes 3/4/5 beyond software

Mirrored from the skill package. This is the canonical English text that Claude actually loads, published here so it can be read next to its Turkish mirror instead of only on GitHub. Edit the source above, not this page; the Turkish mirror is docs/tr/alan-uyarlama.md.

Mizan Domain Adaptation — Modes 3/4/5 Beyond Software

Modes 3, 4, and 5 are software costumes on three universal patterns:

The adaptation recipe (use this for any domain not listed)

Answer six questions; the answers ARE the domain module. Question 0 is the one that decides how much of the software-verification loop actually survives the move:

  1. Arbiter: who returns the verdict on a locked threshold in this domain — a deterministic executor, an independent instrument, a third party, or the claim’s own author? Software’s rigor is borrowed from the runtime, not from the fact that the artifact is code; most domains inherit the protocol and lose the judge. Answer honestly per entry (schema field hypothesis.arbiter, rule R8): author caps the claim at a permanent [KKE], none means the threshold is decorative and the entry stays [S]. A domain where every arbiter is author is not thereby un-auditable — it just cannot produce [K], and saying so is the whole point.

  2. Hop map: where do claims live vs. where does evidence live? (In code: comment vs. implementation. In sales: CRM field vs. activity log.)
  3. Instruments: what produces the numbers, and what are its known distortions?
  4. Confound catalog: what boring explanation produces the same result in this domain?
  5. Ground-truth latency: how fast and how cheaply can a claim be refuted? (Seconds in code; quarters in marketing.) Set expectations: slow domains make “underpowered” the NORM, not the exception.
  6. Prior art: which existing discipline in this domain is already a loose version of this? (Name it in entries; Mizan formalizes, it rarely invents.)

Universal rules that transfer unchanged: append-only history; refuted entries never deleted; surprising positives wait for a symmetric control; where a symmetric control is unethical or impossible (human-subject domains), the claim carries a PERMANENT [KKE] as an honesty label, not a defect. DC-001 applies wherever individual hit rates could be weaponized (sales forecasts, analyst calls, hiring decisions): individual scores stay with the individual; management sees aggregates only.

Domain catalog

Every entry answers question 0 and question 4 on one line, Arbiter / latency, because those two set the entry’s ceiling before any threshold is written: an author arbiter caps at a permanent [KKE] (R8), and a latency of quarters or years makes “underpowered” the expected outcome. Where a domain has two arbiters for two kinds of claim, both are named — the split is usually the most useful thing the line says.

1. Data & Analytics

2. Marketing & Growth

3. Sales & CRM

4. Academic / Scientific Research

5. Finance & Investment Decisions

6. Operations / Manufacturing / Logistics

7. Security & Incident Response

8. Hiring & People Decisions

9. Procurement & Vendor Selection

11. Product / UX Research

12. Content / Journalism / Technical Writing

13. Policy / Program Evaluation (public sector, NGO)

14. Personal Experimentation (health, fitness, productivity)

Anti-pattern for this file

Do not force all five gate fields onto domains where they parody themselves. If a domain entry’s kill condition or metric feels theatrical, record the honest version: “no credible instrument exists → claim stays [S]” is a legitimate, useful outcome.